Load following trialled at Leningrad II
Russia has put its first VVER-1200 unit, Leningrad II-1, through a series of load following trials. The mandatory trials help confirm performance of the power plant. The plant's owner and operator, Rosenergoatom, cycled the output of the 1101 MWe pressurised water reactor from 100% to 75% and back again five times. Next came five cycles between 100% and 50% power.
Corporate ·
Tuesday, 9 November 2021